E. 105th Reduced to One Lane in Either Direction between Chester and Euclid Ave

Beginning Wednesday, March 1, crews will restrict East 105th Street to one lane in each direction between Euclid and Chester avenues while crews work on replacing the pavement on the existing southbound lanes. Traffic will remain restricted to one lane in each direction through summer 2017. Additionally, the sidewalk on the west side of E 105th between Euclid and Chester will be closed throughout construction. Pedestrians should follow the posted pedestrian detour.

 All lanes will remain open on Euclid and Chester Avenues at East 105th Street. 

E105th

On-street Parking Removed at E. 116/117th Street and E. 117th Street Closure

In preparation for the construction of Centric, there is no longer on-street parking along
E. 116th Street and E. 117th Street. Effective immediately, cars parked in areas designated in red on the map below will be ticketed or towed.

Beginning Tuesday, December 27th, E. 117th Street between Euclid Avenue and Mayfield Road will be closed to public access. Access to Cleveland Institute of Art parking lots will be maintained. Please plan your route accordingly. 

For more parking information in University Circle, click here.  

E117thparkingclosure

Parking Lot 45 Closing

Starting November 30th, Lot 45 located north of Mayfield Road and west of the Little Italy University RTA station will be closed permanently in preparation for the construction of the Centric development.

Lot45closing3

Rehabilitation of Cedar Road Bridge

Starting the week of November 28th 2016, Schirmer Construction LLC a contractor to Cuyahoga County Public Works will commence work on the storm water conduits at the base of Cedar Glen. The south sidewalk underneath the bridge carrying CSX, Norfolk and Southern and GCRTA’s trains will be closed for the duration of the project. See map with pedestrian detour below.

Pedestrians are encouraged to follow detour signs. GCRTA’s bus loop lane will be intermittently reduced to 12' throughout the duration of the project. The curb lane for westbound traffic on Cedar Glen Pkwy will also intermittently be reduced but not eliminated. Pedestrian and vehicular traffic signs will be in place.

Work is scheduled for completion by September 4, 2017. 