• Location
  • Call
  • Favorites
  • Cart
Work Transportation Alerts

Transportation Alerts

Sign up for Transportation Alert emails here.

Do you work in, or live in, or visit University Circle? Check our transportation alerts below for up to date transportation information.

Martin Luther King Jr. Drive Night Closure: May 22-26th

Starting Monday, May 22nd Martin Luther King Jr. Drive between Jeptha Drive and Chester Avenue will be shut down between the hours of 7PM and 5AM for work associated with Case Western Reserve University's Nord Family Greenway Project. The sidewalk and segment of the Harrison Dillard Bikeway will also be closed to ensure safety of all travelers. The nightly closures are scheduled to last through Friday, May 26th. Please follow the posted pedestrian and vehicular detours between 7PM and 5AM. 

Mlknightclosure3

Doan Brook Culvert Repair Work on MLK Jr. Drive Begins Monday, May 8th

Union Industrial Contractors, Inc. will begin repair work on the structural arches on Martin Luther King Jr. Dr. over Doan Brook Creek beginning Monday, May 8. While most work will occur off of the roadway, intermittent lane closures will take place on MLK Jr. Dr. north of Superior Avenue for deliveries of construction material outside of peak travel times. The sidewalk will also be affected intermittently. See map for location details. Flaggers will maintain traffic in both directions and assist pedestrians during temporary closures. The project's expected completion date is October 2017. Click here for more information about the project. 

May8transpoalert2

E. 105th Reduced to One Lane in Either Direction between Chester and Euclid Ave

Beginning Wednesday, March 1, crews will restrict East 105th Street to one lane in each direction between Euclid and Chester avenues while crews work on replacing the pavement on the existing southbound lanes. Traffic will remain restricted to one lane in each direction through summer 2017. Additionally, the sidewalk on the west side of E 105th between Euclid and Chester will be closed throughout construction. Pedestrians should follow the posted pedestrian detour.

 All lanes will remain open on Euclid and Chester Avenues at East 105th Street. 

E105th

On-street Parking Removed at E. 116/117th Street and E. 117th Street Closure

In preparation for the construction of Centric, there is no longer on-street parking along
E. 116th Street and E. 117th Street. Effective immediately, cars parked in areas designated in red on the map below will be ticketed or towed.

Beginning Tuesday, December 27th, E. 117th Street between Euclid Avenue and Mayfield Road will be closed to public access. Access to Cleveland Institute of Art parking lots will be maintained. Please plan your route accordingly. 

For more parking information in University Circle, click here.  

E117thparkingclosure

Parking Lot 45 Closing

Starting November 30th, Lot 45 located north of Mayfield Road and west of the Little Italy University RTA station will be closed permanently in preparation for the construction of the Centric development.

Lot45closing3

Rehabilitation of Cedar Road Bridge

Starting the week of November 28th 2016, Schirmer Construction LLC a contractor to Cuyahoga County Public Works will commence work on the storm water conduits at the base of Cedar Glen. The south sidewalk underneath the bridge carrying CSX, Norfolk and Southern and GCRTA’s trains will be closed for the duration of the project. See map with pedestrian detour below.

Pedestrians are encouraged to follow detour signs. GCRTA’s bus loop lane will be intermittently reduced to 12' throughout the duration of the project. The curb lane for westbound traffic on Cedar Glen Pkwy will also intermittently be reduced but not eliminated. Pedestrian and vehicular traffic signs will be in place.

Work is scheduled for completion by September 4, 2017. 

Cedarglensidewalkdetour3

Never miss a thing.

Be the first to know about special events, openings, news and more!

Go
No, thanks. Don't ask me again.